全文获取类型
收费全文 | 286篇 |
免费 | 99篇 |
国内免费 | 18篇 |
出版年
2024年 | 4篇 |
2023年 | 3篇 |
2022年 | 10篇 |
2021年 | 8篇 |
2020年 | 13篇 |
2019年 | 9篇 |
2018年 | 12篇 |
2017年 | 16篇 |
2016年 | 21篇 |
2015年 | 24篇 |
2014年 | 24篇 |
2013年 | 29篇 |
2012年 | 23篇 |
2011年 | 22篇 |
2010年 | 17篇 |
2009年 | 24篇 |
2008年 | 20篇 |
2007年 | 21篇 |
2006年 | 17篇 |
2005年 | 18篇 |
2004年 | 16篇 |
2003年 | 6篇 |
2002年 | 7篇 |
2001年 | 5篇 |
2000年 | 1篇 |
1999年 | 4篇 |
1998年 | 5篇 |
1997年 | 4篇 |
1996年 | 6篇 |
1993年 | 1篇 |
1992年 | 4篇 |
1991年 | 1篇 |
1990年 | 4篇 |
1989年 | 3篇 |
1988年 | 1篇 |
排序方式: 共有403条查询结果,搜索用时 15 毫秒
51.
Nowadays, Chemical-Biological-Radiological-Nuclear-explosive (CBRNe) risks are one of the world's main safety concerns. The radiological disasters of Fukushima and Chernobyl, the chemical events of Seveso or the release of Sarin in the Tokyo Subway, the biological emergencies such as the H1N1 flu or the recent Ebola outbreak, and recent news about the availability of non-conventional weapons acquired by fundamentalist organisations represent evidence of potential future threats. CBRNe risks are a real and global threat. The University of Rome, Tor Vergata, in collaboration with the most important Italian and international bodies working in the field of CBRNe safety and security, and supported by the North Atlantic Treaty Organisation and the Organisation for the Prohibition of Chemical Weapons, organises International Masters Courses on the Protection against CBRNe events. Within this framework, a Table-Top Exercise was planned, in collaboration with the Italian Ministry of Interior and Ministry of Defence. The scenario, the logistic organisation, on-going adjustments during the exercise and the outcomes are presented here and analysed. 相似文献
52.
利用矩阵求极大相容类的一种方法 总被引:1,自引:0,他引:1
寻找相容关系的极大相容类和简单图的极大完全子图,在解决二元关系与数据挖掘和管理决策中的具体问题时有重要作用。利用相容关系的极大相容类与简单图的极大完全子图之间的对应关系,对极大完全子图的路径长度进行分析,得到了关于极大完全子图路径长度的一个定理。并根据该定理构造了一个用矩阵的路径长度搜索简单图的极大完全子图的方法,进而利用该方法找出了对应相容关系的极大相容类。 相似文献
53.
54.
紧急条件下武警部队快速机动最优路径,是一个多目标多约束随机动态交通网络寻优问题。在分析交通网络拓扑化特点及最短路模型前提下,着重研究道路通行能力带给复杂公路网络道路寻优问题的影响,并结合GIS系统利用改进的Dijkstra算法求解。 相似文献
55.
针对机械臂路径规划问题,提出一种基于改进RRT算法的路径规划方法。改进RRT结合了目标偏置策略和贪婪生长策略的优点,在随机采样时,以一定概率使采样点偏置为目标节点,降低随机采样的盲目性,在目标节点方向上采用贪婪式扩展策略,增加随机树局部方向上的生长速度。RRT法规划路径结果并非最优,提出改进GPP法删除多余路径节点,优化机械臂运动路径。通过与Biased-RRT和Greedy-RRT数值仿真结果对比,证明了改进RRT在计算时间、迭代次数、扩展节点数上均优于以上方法。在机械臂两种典型工作环境中的仿真结果表明,使用该方法可以较好解决排爆机械臂避障路径规划问题。 相似文献
56.
We present the green telecommunication network planning problem with switchable base stations, where the location and configuration of the base stations are optimized, while taking into account uncertainty and variability of demand. The problem is formulated as a two‐stage stochastic program under demand uncertainty with integers in both stages. Since solving the presented problem is computationally challenging, we develop the corresponding Dantzig‐Wolfe reformulation and propose a solution approach based on column generation. Comprehensive computational results are provided for instances of varying characteristics. The results show that the joint location and dynamic switching of base stations leads to significant savings in terms of energy cost. Up to 30% reduction in power consumption cost is achieved while still serving all users. In certain cases, allowing dynamic configurations leads to more installed base stations and higher user coverage, while having lower total energy consumption. The Dantzig‐Wolfe reformulation provides solutions with a tight LP‐gap eliminating the need for a full branch‐and‐price scheme. Furthermore, the proposed column generation solution approach is computationally efficient and outperforms CPLEX on the majority of the tested instances. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 351–366, 2016 相似文献
57.
在分析水下航行器路径规划影响因素及主要障碍物特点的基础上,提出了一种基于几何算法的水下航行器路径规划算法,并采用该算法对障碍物进行建模和路径规划研究,解决了水下航行器航经多障碍物海区的路径规划问题.最后,通过仿真试验验证了该算法的准确性与可行性. 相似文献
58.
图论最短路径问题在消防选址中的应用 总被引:1,自引:0,他引:1
姬东 《中国人民武装警察部队学院学报》2009,25(12):10-12
最短路径问题是图论解决的典型实际问题之一,可用来解决管路铺设、线路安装、厂区布局和设备更新等实际问题。介绍了图论最短路径问题及其算法,并应用图论最短路径问题的分析方法,解决城市消防站的选址问题。 相似文献
59.
We consider the scheduling of large‐scale projects to maximize the project net present value given temporal and resource constraints. The net present value objective emphasizes the financial aspects of project management. Temporal constraints between the start times of activities make it possible to handle practical problem assumptions. Scarce resources are an expression of rising cost. Since optimization techniques are not expedient to solve such problems and most heuristic methods known from literature cannot deal with general temporal constraints, we propose a new bidirectional priority‐rule based method. Scheduling activities with positive cash flows as early and activities with negative cash flows as late as possible results in a method which is completed by unscheduling techniques to cope with scarce resources. In a computational experiment, we compare the well‐known serial generation scheme where all activities are scheduled as early as possible with the proposed bidirectional approach. On the basis of a comprehensive data set known from literature containing instances with up to 1002 activities, the efficiency of the new approach is demonstrated. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2003 相似文献
60.